摘要
文章介绍了上海临港产业区桩基处理工程,详细分析了工程的沉桩设备选择、施工方法、关键技术要求,以及保证质量的施工技术措施,工程取得了良好地社会效益和经济效益。
In this article, the author introduces the Shanghai Lingang district industrial zone of pile foundation treatment engineering, and detailed analysis of the engineering pile driv-ing equipment selection, construction methods, key technical requirements as wel as the quality of construction technical measures, and the project has achieved good social and eco-nomic benefits.
出处
《城市建筑》
2013年第7期101-101,104,共2页
Urbanism and Architecture
关键词
桩基施工
PHC管桩
沉桩
pile foundation construction, PHC pipe piles, pile driving