期刊文献+

地铁工程土压平衡式盾构施工技术要点分析 被引量:6

Analysis on the Key Points of Earth Pressure Balanced Shield Construction in Subway Engineering
下载PDF
导出
摘要 土压平衡式盾构施工技术在实际掘进作业中需确保土仓压力和开挖面土压力的平衡。盾构施工技术不仅具有较强的涂层适应性,而且还能够在复杂的地质条件下依然能够安全作业。通过深入分析地铁工程土压平衡式盾构施工技术,合理调整施工测量,最提升地铁工程的施工水平,促进现代城市更好的发展具有重要的意义。 The earth pressure balance shield construction technology should ensure the balance between the earth pressure and the earth pressure of excavated surface in the actual excavation operation. Shield construction technology not only has strong coating adaptability, but also can work safely under complicated geological conditions. It is of great significance to improve the construction level of subway engineering and promote the better development of modern city by deeply analyzing the earth pressure balance shield construction technology of subway engineering and adjusting construction survey reasonably.
作者 林凯凯 Lin Kai-kai(China Railway 18 Bureau Group co., Ltd., Tianjin, 300000, China)
出处 《佳木斯职业学院学报》 2018年第11期486-487,共2页 Journal of Jiamusi Vocational Institute
关键词 地铁工程 土压 平衡式 盾构 subway engineering earth pressure balance shield
  • 相关文献

参考文献4

二级参考文献15

共引文献11

同被引文献16

引证文献6

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部