摘要
介绍了崖门大桥施工中索力测试的测试方案,重点介绍了频率法测量索力的测试原理,并给出了部分测量结果,最后还就如何进一步提高索力测量精度进行了探讨。
The schemes for cable force measurement during construction of Yamen Bridge are described and the principle of the cable force measurement with frequency method is dealt with in considerable details. Part of the results of the measurement is presented and ways to improve the accuracy of the measurements are discussed as well.
出处
《桥梁建设》
EI
CSCD
北大核心
2003年第1期23-26,共4页
Bridge Construction