摘要
结合潭邵高速公路大塘水库的实际情况 ,针对大塘水库段路堤设计方案进行分析比较 ,提出采用加筋土挡土墙的方案及方案实施工艺。
In conjunction with the practice of Datang reservoir on Tan Shao Expressway, and in the light of the analysis and comparison of design alternatives for the reservoir, an alternative of reinforced retaining wall and its construction process are proposed According to the observation results of its wall displacement and settlement, it is proved that this alternative is technically practical
出处
《公路》
北大核心
2003年第1期86-89,共4页
Highway