期刊文献+

浅谈高扬程电力提灌工程泵站经济运行的措施 被引量:4

Talking about the economic operation measures of pumping station in high lift electric irrigation project
下载PDF
导出
摘要 高扬程电力提灌工程在运行的时候,其特点在于泵站的数量较多,扬程较高,而且机组运行过程中会消耗大量的资源,消耗的时间比较大,所以,一定要重点分析对泵站运行经济效益产生影响的原因,并且合理的寻找相关的途径和对策进行解决,能够让工程经济效益大幅度提高,具有非常重要的现实意义。 The high lift power engineering at run time, its characteristic is that the number of pumping station is more, head high, and consumes a lot of resources, in the process of the equipment operation time consumption is large, so be sure to focus on analysis of pumping stations causes that affect the economic benefits, and a reasonable way to search for relevant and countermeasures to solve, can let the engineering economic benefit increased greatly, has very important practical significance.
作者 岳永霞
出处 《中国建材科技》 2019年第1期142-143,共2页 China Building Materials Science & Technology
关键词 高扬程 电力提灌工程 泵站 经济运行 影响原因 措施 high lift power supply and irrigation project pumping station economic operation causes of influence measures
  • 相关文献

参考文献2

二级参考文献3

共引文献10

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部