摘要
高扬程电力提灌工程在运行的时候,其特点在于泵站的数量较多,扬程较高,而且机组运行过程中会消耗大量的资源,消耗的时间比较大,所以,一定要重点分析对泵站运行经济效益产生影响的原因,并且合理的寻找相关的途径和对策进行解决,能够让工程经济效益大幅度提高,具有非常重要的现实意义。
The high lift power engineering at run time, its characteristic is that the number of pumping station is more, head high, and consumes a lot of resources, in the process of the equipment operation time consumption is large, so be sure to focus on analysis of pumping stations causes that affect the economic benefits, and a reasonable way to search for relevant and countermeasures to solve, can let the engineering economic benefit increased greatly, has very important practical significance.
出处
《中国建材科技》
2019年第1期142-143,共2页
China Building Materials Science & Technology
关键词
高扬程
电力提灌工程
泵站
经济运行
影响原因
措施
high lift
power supply and irrigation project
pumping station
economic operation
causes of influence
measures