摘要
本文针对武钢大型厂1#加热炉能耗高结构不合理的问题对炉子进行了改造,效果明显。
In light of the high energy consumption due to the unreasonable structure of No.1 reheating furnace of the Heavy Section Mill a revamping of the furnace has been conducted and encouraging efficiencies obtained.
出处
《钢铁研究》
CAS
1992年第4期31-34,共4页
Research on Iron and Steel