通过对江西军潭电站4号机增容改造实践,提出了使用高效率大过流量新型转轮替代老转轮必须注意的技术问题及转轮布置的具体方法,还总结了制订改造方案必须注意的若干问题.
Based on the practice of expanding the capacity for the No. 4 turbine in Jiangxi Juntan hydroelectric plant, It is presented how to use a new effective over-flowed turbine wheel, and a detailed method to arranging the turbinewheel is also put forward. Some problems should be focused on with a modification plan made.
出处
《南昌水专学报》
2002年第4期61-62,共2页
Journal of Nanchang College of Water Conservancy and Hydroelectric Power