摘要
通过分析妈湾电厂 2号汽轮机达不到设计出力、热耗高存在的问题 ,主要对汽轮机疏水系统和给水加热系统进行了优化 ,减少了工质泄漏 ,提高回热效率 ,改善凝汽器真空 。
Based on the analysis of low output and high heat consumption of No.2 turbine in Mawan Power Plant,it is mainly to optimize the drainage system and feed water heating system,decrease leakage,improve heat recovery efficiency and increase vacuum of condenser to upgrade the efficiency of HP,MP and LP cylinder of turbine.
出处
《湖北电力》
2002年第5期43-45,共3页
Hubei Electric Power