摘要
本文根据笔者在青藏铁路初、定测工作中的亲身经历 ,对多年冻土区的工程地质工作进行了详细的归纳、总结 。
According to working experience in Qingzang railway, the engineering geology of perennially frozen ground is descripted in detail. Meanwhile, the main construction engineering geology is given pride to the comrades for reference.
出处
《铁道工程学报》
EI
2002年第4期50-52,37,共4页
Journal of Railway Engineering Society