岭澳核电站二期3号发变组一次通流研究与应用 被引量:1

Study and application of primary current injection of 3# generator-transformer group of Ling 'ao Ⅱ
下载PDF
导出
摘要 发变组一次通流试验在核电站的调试过程中是非常必要的。岭澳核电站二期电气调试人员通过对3号发变组一次通流试验的研究和理论论证,创新了试验方法,试验实施取得圆满成功,试验结果符合要求,达到了预期效果。 The primary current injection test of generator-transformer group is very important during the commissioning of nuclear power plant.Through the study and theoretical demonstration on the primary current injection of 3 # generator-transformer group during commissioning of the electric equipment of Ling'ao Ⅱ,the test procedures were innovated,which was proved a great success during its the implementation.The test results met relevant requirements and achieved expected effect.
出处 《核科学与工程》 CSCD 北大核心 2010年第S1期270-274,共5页 Nuclear Science and Engineering
关键词 发变组一次通流 试验方法研究创新 flow time transformer unit test method of innovation