摘要
发变组一次通流试验在核电站的调试过程中是非常必要的。岭澳核电站二期电气调试人员通过对3号发变组一次通流试验的研究和理论论证,创新了试验方法,试验实施取得圆满成功,试验结果符合要求,达到了预期效果。
The primary current injection test of generator-transformer group is very important during the commissioning of nuclear power plant.Through the study and theoretical demonstration on the primary current injection of 3 # generator-transformer group during commissioning of the electric equipment of Ling'ao Ⅱ,the test procedures were innovated,which was proved a great success during its the implementation.The test results met relevant requirements and achieved expected effect.