7Bai Yong,Bai Qiang.Subsea engineering handbook[M].[S.l.]:Gulf Professional Publishing,2010:44-47. 被引量:1
8Colodette G,Pereira C,Siqueira C,et al.The new deepwater oil and gas province in Brazil:Flow assurance and artificial lift:Innovations for Jubarte heavy oil[R].OTC 19083,2007. 被引量:1
9Ansah J,Quaimi B,Shehab M A,et al.Two-zone commingled production using intelligent well completion coupled with ESP through a hydraulic disconnect tool[R].SPE 120303,2009. 被引量:1