摘要
介绍了马来西亚Sabah-RP电厂190 MW联合循环燃机APS控制策略,对余热锅炉和蒸汽轮机的APS功能和APS系统设计要点进行了分析,总结了投运过程中的常见问题。
The control strategy of APS of 190 MW combined cycle gas turbine unit in SABAH-RP power plant was introduced,the APS function and key design of the unit waste heat boiler and turbine were ananlyzed,and these common problems during commissionging were summed.It could be also reference for similar project.
出处
《湖北电力》
2015年第4期71-73,共3页
Hubei Electric Power