摘要
在工程项目的施工过程中,发生设计变更和现场签证是相当普遍的,所以设计变变更和现场签证工作是工程承包管理中很重要的一项内容,本文全面阐述了施工阶段中设计变更和现场签证的管理方法。
Such events as design alternation and on-site certificate are quite ordinary during the operation of an engineering project. And thus design alternation and on-site certificate are very important in the management of project contractmanagement. The management methods of design alternation and on-site certificate are expounded all sided.
出处
《建筑管理现代化》
2002年第4期63-64,共2页
Construction Management Modernization