从模拟试验和现场实测发现:随着综放工作面长度的增加,采场覆岩关键层的破裂块度将相应减小,因而采场来压均匀,便于顶煤破碎和放出,但会发生主关键层来压现象,必须采取相应措施,将其加以有效控制。
It is found by model experiment and field measurement that with the length of fully-mechanized coal face, the size of the broken blocks of key strata in the coal face will decrease correspondingly, and thus the rock pressure in the face is much welldistributed. This is good for the top coal broken and caving conveniently. However, the overlying rock pressure of the main key strata will happen accordingly. Furthermore, the relevant measurements must be taken efficiently to control the key strata for coal mining safely.