摘要
结合广州市中医院同德围分院项目工程特点,详细阐述了多溶洞地质条件下基础抗浮锚杆的后置施工,与传统锚杆施工思路进行了对比分析,其结论为类似工程地质条件下地下室抗浮锚杆设计及施工提供了宝贵的工程实践经验。
Combining with the characteristics of project engineering tongde wai on the hospital in guangzhou branch,in detail elaborated the karst cave geological conditions more basic fe asibility of rear construction,compared with traditional ideology on the anchor rod construction analysis,the conclusion for the similar engineering geological conditions in the basement anti-floating anchor rod design and construction,which can provide valuable experience of engineering practice.
出处
《广东土木与建筑》
2015年第2期23-26,11,共5页
Guangdong Architecture Civil Engineering
关键词
溶洞
抗浮锚杆
基岩裂隙水
垫层
karts cave
anti-floating anchor
bedrock fissure water
subcrust