摘要
对衡山索道工程中双承载,双牵引鞍座在上、下站房及线路上的配置和主要技术参数、结构进行了较详细的叙述与分析。
The arrangement of double bearing, double traction saddles in upper and lower station rooms and lines between them in Mount Heng ropeway project and the main technical parameters and structures are described and analyzed in detail
出处
《冶金矿山设计与建设》
2002年第6期27-31,共5页
Metal Mine Design & Construction