摘要 压缩空气储能是未来最具发展潜力的大规模储能方式之一,人工洞室储气库作为压缩空气储能电站的重要组成部分,其选址和设计技术直接关系工程的安全性和经济性。在整理分析国内外相关研究成果的基础上,结合国内压缩空气储能电站的选址经验,并参考水工隧道的设计经验,对压缩空气储能电站人工洞室储气库选址原则及选型布置、支护结构、密封结构设计方法和设计原则进行归纳总结。 Compressed air energy storage(CAES)is one of the most promising large-scale energy storage methods in the future.As an important part of CAES power plant,the siting and design technology of artificial chamber gas storage is directly related to the safety and economical efficiency of the project.Based on the research results at home and abroad,combined with the domestic experience of CAES power station siting,and with reference to the design experience of hydraulic tunnels,principles of site and type selection,design methods and design principles of support structure and sealing structure of CAES power station artificial chamber gas storage were summarized.
作者 饶虎 王瑞 RAO Hu;WANG Rui(Northwest Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Xi'an 710075,China)
出处 《电力勘测设计》 2024年第S02期64-71,共8页 Electric Power Survey & Design
关键词 压缩空气储能 人工洞室储气库 选址选型 支护 密封 compressed air energy storage artificial chamber gas storage site and type selection supporting sealing
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部