决定高铁运行水平的关键因素就是接触网和受电弓之间的动态性能,如果高铁接触网弓网关系不够稳定,会给高铁的供电能力造成一定程度的影响。深入探讨了贵广高铁接触网曲线段定位器坡度优化调整策略,针对定位器既有的坡度问题,提出了一系列创新性的优化方案,提升了列车运行平稳性、安全性及接触网系统整体性能,保障高铁安全高效运行。
The key factor determining the operational level of high-speed rail is the dynamic performance between the overhead contact system and pantograph.If the relationship between the overhead contact system and pantograph is not stable enough,it will have a certain degree of impact on the power supply capacity of high-speed rail.This article explores in depth the optimization and adjustment strategy of the slope of the locator on the curved section of the contact network of the Guiyang Guangzhou high-speed railway.In response to the existing slope problem of the locator,a series of innovative optimization solutions are proposed to improve the stability,safety,and overall performance of the contact network system of the train,ensuring the safe and efficient operation of the high-speed railway.
作者
李彬
Li Bin(China Railway Construction Electrification Bureau Group First Engineering Co.,Ltd.,Luoyang,Henan 471800)
出处
《现代工程科技》
2024年第21期101-104,共4页
Modern Engineering Technology
关键词
贵广高铁
接触网
曲线段
定位器坡度
优化调整
运行平稳性
Guizhou Guangzhou high-speed railway
contact network
curve segment
positioner slope
optimization and adjustment