水闸工程是一种重要的水利工程,在防洪、治涝、灌溉、供水、航运、发电等方面应用十分广泛。一些多功能水闸往往因为部分功能需求,电缆敷设需跨闸室布置,在敷设方案的选用上,需充分考虑施工期及运行管理期各种功能的需求和不利影响。以瑞安市下埠水闸提升完善工程中电缆敷设方式的选择为例,通过对结构影响、施工难度、经济性、运行管理、景观影响等方面的综合分析,选择合理的敷设方式,可供类似工程借鉴。
Sluice engineering is a kind of significant water conservancy projects,employed extensively in flood control,irrigation,water supply,shipping,power generation,and other fields.In some cases,multifunctional sluices necessitate the installation of cables across the gate chamber in order to satisfy specific operational requirements.In selecting a laying plan,it is essential to consider the various functional requirements and potential adverse effects throughout the construction and operational phases.The selection of cable laying methods in the Xiabu Water Lock improvement project in Rui’an City serves as a case study,demonstrating the value of a comprehensive analysis of structural impact,construction difficulty,economy,operational management,landscape impact,and other factors in determining an appropriate laying method for similar projects.
作者
柯学佳
陈国勋
许方安
周慧芬
KE Xuejia;CHEN Guoxun;XU Fang’an;ZHOU Huifen(Wenzhou Wenruiping Water System Management Center,Wenzhou 325000,Zhejiang,China;Wenzhou Water Conservancy Construction Management Center,Wenzhou 325000,Zhejiang,China;Wenzhou Water Resources and Electric Power Survey and Design Institute Co.,Ltd.,Wenzhou 325000,Zhejiang,China)
出处
《浙江水利科技》
2024年第6期43-47,共5页
Zhejiang Hydrotechnics
关键词
多功能
水闸
跨闸室
电缆敷设
上行布置
下行布置
multifunctional
sluice
cross gate chamber
cable laying
upward deployment
downward deployment