摘要
本为围绕加吉水库减压池与输水管道基坑开挖的关键技术展开研究,旨在通过科学合理的施工技术和管理措施,保障施工安全、提高工程质量。通过对该项目减压池与输水管道基坑开挖技术要点的深入分析,本文详细探讨了其基坑开挖的关键技术,包括表层清理、土方开挖、坡面修整、基础面处理和基面验收等。实践表明,采用科学的施工技术和严格的质量控制措施,能有效避免基坑开挖过程中的质量问题,保障工程的顺利进行。
This study focuses on the key technologies of excavation for the pressure relief pool and water pipeline foundation pit of Jiaji Reservoir,aiming to ensure construction safety and improve engineering quality through scientific and reasonable construction techniques and management measures.Through an in-depth analysis of the excavation techniques for the depressurization tank and water pipeline foundation pit of the project,this article discusses in detail the key techniques for excavation,including surface cleaning,earthwork excavation,slope finishing,foundation treatment,and foundation acceptance.Practice has shown that adopting scientific construction techniques and strict quality control measures can effectively avoid quality problems during excavation of foundation pits and ensure the smooth progress of the project.
作者
张军
ZHANG Jun(Gansu Provincial Water Resources and Hydropower Engineering Bureau Co.,Ltd.Lanzhou 730000,China)
出处
《全面腐蚀控制》
2024年第11期143-146,共4页
Total Corrosion Control
关键词
减压池与输水管道
基坑开挖
关键技术
pressure relief tank and water delivery pipeline
excavation of foundation pit
key technologies