长距离引水式水电站机组压力管道快速排水研究

On the Rapid Drainage of the Penstock for Long-distance Water Diversion Type Hydro-turbine Units
下载PDF
导出
摘要 大型水电站压力管道排水量大,仅依靠压力管道的排水装置进行排水,不能满足快速排水的需求。在分析三种机组排水方式特点基础上,提出了自动开导叶排水基本条件和关键过程,根据机组转速、导叶开度以及关键节点的时间等参数控制排水流程,从而实现压力钢管快速排水。 The drainage volume of the penstock in large-scale hydropower stations is usually large.Relying solely on the drainage device of the penstock,the rapid drainage requirement cannot be met.Based on the analysis of the characteristics of three drainage methods of the units,the basic conditions and key processes of the automatic guide vane opening drainage are determined.Thus,the drainage process can be controlled according to parameters such as the unit speed,guide vane opening,and key point time,thereby achieving the rapid drainage of the penstock.
作者 刘琦 鲁瑶 刘大斌 李长泉 LIU Qi;LU Yao;LIU Dabin;LI Changquan(Xiluodu Hydropower Plant,China Yangtze Power Co.,Ltd.,Zhaotong 657300,China)
出处 《水电与新能源》 2024年第11期12-14,共3页 Hydropower and New Energy
关键词 水电站 长距离引水 压力管道 快速排水 hydropower station long-distance water diversion penstock rapid drainage
  • 相关文献

参考文献6

二级参考文献19

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部