摘要 输水系统线路比选是抽水蓄能电站可行性研究阶段重要的设计内容,需通过多方案比较确定。笔者以广西某抽水蓄能电站为例,分析输水系统线路选择的原则,并从地形地质条件、工程布置、施工组织、可比工程投资等方面对结合地形条件初步拟定的2个输水系统线路方案进行综合对比分析,最终确定最优方案。设计思路可供其他类似工程借鉴。 The line selection of water conveyance system is an important design content in the feasibility study stage of pumped storage power station,which needs to be determined by comparison of multiple schemes.Taking a pumped storage power station in Guangxi as an example,the authors analyze the principle of line selection of water conveyance system,and comprehensively compare and analyze the two line schemes of water conveyance system preliminarily formulated in combination with topographic conditions from the aspects of topographic and geological conditions,engineering layout,construction organization and comparable engineering investment,and the optimal scheme is determined finally.The design ideas can be used for reference by other similar projects.
作者 熊图耀 吕太健 郭晓萍 XIONG Tuyao;LYU Taijian;GUO Xiaoping(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530007,China)
出处 《红水河》 2024年第5期90-95,共6页
关键词 输水系统 线路比选 抽水蓄能电站 water conveyance system line selection pumped storage power station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部