摘要 现状小作河渡槽为矩形单槽结构,河槽下部结构为桩柱一体式支撑结构,灌注桩深入弱风化岩1 m,地面以下5 m均为卵石。新建鹿泉—井陉输气管道一次穿越渡槽,采用顶管方式在基础灌注桩之间卵石层穿过。从穿越水平距离、埋深等方面进行分析论证,经计算冲刷深度2.68 m,管顶埋深、管壁间距均满足规范要求,穿越方案合理。 The current situation of Xiaozuo River Aqueduct is a rectangular single channel structure,and the lower structure of the river channel is a pile column integrated support structure.The cast-in-place piles penetrate 1m deep into the weakly weathered rock,and 5m below the ground is composed of pebbles.The newly-built Luquan to Jingxing gas pipeline crosses the aqueduct in one go,using the top-down method to pass through the gravel layer between the foundation cast-in-place piles.From the aspects of horizontal distance and burial depth,it is analyzed and demonstrated that the calculated scouring depth is 2.68m,and the burial depth of the pipe top and the spacing between the pipe walls meet the requirements of the specifications.The crossing plan is reasonable.
作者 康亚腾 KANG Yateng(Hebei Institute of Investigation&Design of Water Conservancy&Hydropower Group Limited,Tianjin 300220,China)
出处 《水科学与工程技术》 2024年第5期77-78,共2页 Water Sciences and Engineering Technology
关键词 灌注桩 卵石 顶管 水平距离 埋深 cast-in-place pile pebbles pipe jacking horizontal distance buried deep
  • 相关文献

参考文献3

二级参考文献12

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部