简述了某“华龙一号”反应堆为满足热态功能试验(HFT)期间一回路加氢钝化工艺实施的水化学要求而在化学平台、热停平台、一回路升温与降温等阶段所采取的水质控制方法,并对水化学控制的实施结果进行了分析。控制结果显示,该机组加氢钝化实施过程各水质指标均被控制在预期范围。
In order to meet the hydrochemical control requirements of primary circuit hydrogenation passivation process during HFT,the water quality control methods adopted in chemical platform,thermal shutdown platform and primary heating and cooling stages of HPR1000 unit are briefly described,and the implementation results are analyzed.The control results show that the water quality indexes of the HPR1000 unit are controlled within the expected range during the implementation of hydrogenation passivation.