期刊文献+

某既有超限高层结构加固改造设计

Structural rehabilitation and remodeling design of a high-rised existing building beyond code specification
下载PDF
导出
摘要 依托某既有超限高层建筑,设计开发了在框架结构的基础上新增剪力墙,改变结构受力体系的加固改造方案,将原结构转变为高度和规则性不超限的高层建筑,并采用YJK空间分析程序进行弹性分析、SAUSAGE软件进行弹塑性时程分析。结果表明,改变受力体系以后,结构抗震性能良好,且减少了加固改造的经济成本及施工难度,综合效益显著,证明采取的技术手段是合理有效的,可为后续项目提供参考。 Based on an existing building beyond code specification,this paper designs and develops a reinforcement scheme that adds a shear wall on the basis of the frame structure,and changes the structural stress system,so as to transform the original building into a high-rise building that meets code requirements.The YJK spatial analysis program was used for elastic analysis,and the SAUSAGE software was used for elastoplastic time course analysis.The results show that after changing the stress system,the seismic performance of the structure meets the standards of building codes,the economic cost and reconstruction difficulty of the reinforcement transformation are reduced,the comprehensive benefits are significant,which proves that the technical means adopted are reasonable and effective.The project can provide reference for subsequent projects.
作者 刘莉娜 曹宇 高美娇 Liu Lina;Cao Yu;Gao Meijiao(Tianjin University Research Institute of Architectural Design and Urban Planning Co.,Ltd.,Tianjin 300073,China)
出处 《山西建筑》 2024年第20期55-57,101,共4页 Shanxi Architecture
基金 天津市制造业高质量发展专项资金项目:新型建筑工业化生产体系关键技术与示范(项目编号:23ZGCXQY00010)。
关键词 超限高层 改变受力体系 加固改造 弹塑性分析 building beyond code specification change the stress system structural rehabilitation and remodeling design elastoplastic analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部