摘要
针对岩土工程中水文地质勘察及施工质量控制问题,分析某水库工程现状,通过地球物理勘探技术获取地下水文信息,详细调查和分析地质条件,制定相应的施工措施。结果表明,通过有效的质量控制措施,勘察数据完整性达到98%,准确性达到95%。施工质量评价值达到98%,施工成本效益达到92%。
Aiming at the problems of hydrogeological investigation and construction quality control in geotechnical engineering,this paper analyzes the current situation of a reservoir project,obtains underground hydrology information through geophysical exploration technology,investigates and analyzes geological conditions in detail,and makes corresponding construction measures.The results show that through effective quality control measures,the integrity of the survey data reaches 98%and the accuracy reaches 95%.The construction quality evaluation value reached 98%,and the construction cost efficiency reached 92%.
作者
王时民
WANG Shi-min(Zhongji Jigu Construction Engineering Co.Ltd.,Guiyang 550004,China)
出处
《工程建设与设计》
2024年第17期39-41,共3页
Construction & Design for Engineering
关键词
岩土工程
勘察
水文
地质
渗透系数
施工措施
geotechnical engineering
survey
hydrology
geology
permeability coefficient
construction measures