期刊文献+

金属矿山斜井施工中的挑战与解决方案

Challenges and solutions in inclined shaft construction of metal mine
下载PDF
导出
摘要 金属矿山斜井施工涉及复杂的地质条件和高强度的技术要求,面临诸多挑战,如岩层稳定性、施工设备的适应性、环境保护以及安全管理问题。本文详细探讨了改进地质勘探技术、使用高效掘进设备、实施自动化施工技术以及采用智能通风和实时监测系统等解决方案,分析了典型案例中的应用效果和成功经验。本文旨在为相关工程项目提供技术指导和参考,推动金属矿山斜井施工的高效、安全发展。 Inclined shaft construction in metal mine involves complicated geological conditions and high intensity technical requirements,and faces many challenges,such as rock formation stability,adaptability of construction equipment,environmental protection and safety management.This paper discusses in detail solutions such as improving geological exploration technology,using efficient tunneling equipment,implementing automated construction technology,and adopting intelligent ventilation and real-time monitoring systems,and analyzes the application effects and successful experiences in typical cases.The purpose of this paper is to provide technical guidance and reference for related projects,and promote the efficient and safe development of inclined shaft construction in metal mines.
作者 官洺宇 GUAN Ming-yu(Liaoning Paishanlou Gold Mining Co.,Ltd.Fuxin 123000,China)
出处 《世界有色金属》 2024年第13期112-114,共3页 World Nonferrous Metals
关键词 金属矿山 斜井施工 挑战 解决方案 metal mine inclined shaft construction challenge solution
  • 相关文献

参考文献5

二级参考文献14

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部