本篇文章以南湖水环境提升工程初期雨水收集系统工程12#~13#顶管区间为例,主要从工艺原理、工艺操作要点及质量控制措施探讨了大直径曲线泥水平衡顶管施工技术在工程中的应用。
This article takes the 12#~13#pipe jacking section of the rainwater collection system project in the early stage of the Nanhu waterenvironment improvement project as an example,and mainly discusses the application of large-diameter curve mud water balance pipe jacking construction technology in the project from the perspective of process principles,process operation points,and quality control measures.