本文以市政道路水泥稳定碎石基层施工为对象进行研究,结合某市政道路施工案例,对水泥稳定碎石基层双层连铺施工技术要点进行分析,包括施工材料选择和检测、材料配置和运输以及路面混合料的摊铺碾压等,并且顺利完成本次市政道路施工任务,达到了预期施工目标,可供相关人员参考。
This paper takes cement stabilized gravel base construction of municipal roads as the object of study,and combined with a municipal road construction case,analyzes the key points of construction technology of cement stabilized gravel base double-layer joint paving,including construction material selection and testing,material configuration and transportation,pavement mixture paving and rolling,etc.,and successfully completes this municipal road construction task.The expected construction target has been achieved,which can be used for reference by relevant personnel.