摘要
5G基站建设数量激增带来的大量负荷影响了配电网的运行经济性,但基站备用储能在保证可靠性的动态备电前提下能够参与削峰填谷,如何利用配电网重构和储能调控提高双方运行经济性亟待研究。该文首先分析了5G基站备用储能的调控潜力,建立了基站储能可调控容量模型。针对配电网不同拓扑结构的节点可靠性,利用序贯蒙特卡洛法进行评估,提出了考虑节点可靠性的基站储能备电时长确定方法。在此基础上,构造了考虑5G基站备用储能优化调控的配电网重构双层优化模型。通过算例说明,该文提出的重构模型考虑了基站备用储能削峰填谷,使配电网运行经济性更高;重构提高了节点的可靠性,使基站储能拥有更大的调控空间,有效地降低了基站运行成本,实现了双方的互利共赢。
The massive load from the surge of the 5G base station construction affects the operational economics of the distribution network.However,base station backup energy storage can participate in peak reduction and valley filling under the guarantee of reliability and dynamic power backup.How to use distribution network reconfiguration and energy storage regulation to improve the operational economy of both sides needs to be studied.Firstly,considering that the 5G base station backup energy storage needs to ensure the uninterrupted operation of the base station,this paper analyses the regulation potential of 5G base station backup energy storage and establishes a model for the regulable capacity of base station energy storage.Secondly,considering that the topology of the distribution network is changed after reconfiguration and the power supply paths of some nodes are changed,which leads to changes in node reliability and changes in the 5G base station backup demand,this paper use the sequential Monte Carlo method to evaluates the node reliability of the distribution network with different topologies and proposes a method to determine the backup duration of base station energy storage considering the node reliability.Thirdly,this paper constructs a two-layer optimization model for distribution network reconfiguration considering optimal regulation of 5G base station backup energy storage.The upper-layer model is reconfigured with the objective of minimum comprehensive operating cost of the distribution network,and the lower-layer model determines the base station energy storage regulation strategy with the objectives of minimum the base station operating cost and load curve variance.Finally,the CPLEX commercial solver in Yalmip toolbox of Matlab platform is used to solve the model.The upper-layer model transmits the reconfiguration results to the lower-layer,and the lower-layer model determines the backup duration of 5G base station energy storage under this topology structure and solves the base station energy stora
作者
麻秀范
张乐萱
于琨澎
杨璐
Ma Xiufan;Zhang Lexuan;Yu Kunpeng;Yang Lu(School of Electrical and Electronic Engineering,North China Electric Power University,Beijing 102206,China)
出处
《电工技术学报》
EI
CSCD
北大核心
2024年第16期5028-5041,共14页
Transactions of China Electrotechnical Society
基金
国家电网公司总部科技项目资助(5700-202255477A-2-0-KJ)。
关键词
5G基站
备用储能
配电网重构
可靠性
5G base station
backup energy storage
distribution network reconfiguration
reliability