摘要
江都通南高沙土区引水工程是扬州市江都区水资源综合治理工程的重要组成部分。根据区域内河网分布和沿江、淮取水工程现状,分析水量供需关系,确定引水泵站改扩建最佳布局和规模,并应用MIKE11模型对西北片区进行生态流量模拟。结果表明,江都通南高沙土区闸站改扩建方案能够有效提升区域灌溉引水能力及生态补水能力,进一步优化水系的引、排、航功能,为区域经济社会发展提供了基础保障。
The water diversion project in the high sandy soil area in Tongnan,Jiangdu is an important part of the comprehensive water resources management in Jiangdu District,Yangzhou City.Based on the distribution of river networks in the region and the current status of water diversion projects along the Yangtze River and Huaihe River,the relationship between water supply and demand is analyzed,the optimal layout and scale of water diversion pump station reconstruction and expansion are determined,and the MIKE11 model is applied to simulate ecological flow in the northwest area.The results show that the reconstruction and expansion plan of the gate station in the high sandy soil area of Tongnan,Jiangdu District can improve the regional irrigation water diversion capacity and ecological water replenishment capacity effectively,further optimize the diversion,drainage and navigation functions of the water system,and provide basic guarantee for regional economic and social development.
作者
吴宏达
胡堃昊
童骁
WU Hongda;HU Kunhao;TONG Xiao(Jiangdu District Water Affairs Bureau of Yangzhou City,Yangzhou 225200,China)
出处
《江苏水利》
2024年第8期22-25,共4页
Jiangsu Water Resources
关键词
泵站改扩建
引水工程
高沙土区
MIKE11模型
renovation and expansion of pump station
water diversion project
high sandy soil area
MIKE11 model