转炉一次湿法除尘遗留问题治理

Handling of Problems Caused by Primary Wet Dedusting in Converter
下载PDF
导出
摘要 针对转炉一次湿法除尘升级改造后存在的风机转速波动、放散塔冒烟及溢流水箱安全隐患等问题,分析了问题产生的原因,采取了加强排水能力,调整环缝开度及压差并取消溢流水箱的措施,实现了风机稳定运行,烟尘排放指标减低到30 mg/m3以内,提高了转炉一次湿法除尘效果,保证了生产的安全稳定运行。 Aiming at the problems such as speed fluctuation of the fan,smoke emissions from the diffusing tower and potential safety hazards existed in operation of overflow water tanks after upgrading the primary wet dedusting in a converter,the causes leading to these problems were analyzed.After taking such measures as strengthening the drainage capacity,adjusting the opening degree of the circular seams and pressure differences as well as dismounting the overflow water tanks,the stable operation of the fan was realized.And therefore the emission index of the dust was reduced to less than 30 mg/m3,which improved the effect of primary wet dedusting in the converter and ensured the safe and stable operation in production.
作者 董光宇 贾东升 李春生 姚宝强 高胜利 陈晨 DONG Guangyu;JIA Dongsheng;LI Chunsheng;YAO Baoqiang;GAO Shengli;CHEN Chen(Bayuquan Branch of Angang Steel Co.,Ltd.,Yingkou 115007,Liaoning,China)
出处 《鞍钢技术》 CAS 2024年第4期53-56,76,共5页 Angang Technology
关键词 转炉湿法除尘 风机转速 放散塔 环缝开度 wet dedusting in converter fan speed diffusing tower opening degree of circular seam
  • 相关文献

参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部