摘要
为了有效控制公路桥梁基础工程施工质量,以汾石高速项目作为研究对象,应用文献参考法和钻孔灌注桩施工技术,分别从项目概况、施工准备阶段、施工建设阶段、竣工验收阶段四个方面,对钻孔灌注桩施工技术的运用情况进行了具体分析,结果表明,做好各阶段的施工技术控制有利于保障此类工程施工质量。
In order to effectively control the construction quality of highway bridge foundation engineering,this study takes Fenshi Expressway project as the research object,applies the literature reference method and borehole pile construction technology,and analyzes the application of bored pile construction technology from four aspects:project overview,construction preparation stage,construction stage and completion acceptance stage.The results show that,It is beneficial to ensure the construction quality of this kind of project to control the construction technology in each stage during operation.
作者
冯婉
FENG Wan(Shanxi Road and Bridge Construction Group Co.,Ltd.,Taiyuan,Shanxi 030006,China)
出处
《黑龙江交通科技》
2024年第7期86-89,共4页
Communications Science and Technology Heilongjiang
关键词
公路桥梁
钻孔灌注桩
施工技术
highway and bridges
bored pile
construction technology