摘要
为了选取适宜的施工导流方案,结合栏杆泄洪渠的实际情况及工程经验,选取了多方案方案进行对比分析,从工程占地、投资、施工安全、施工难度及工期等方面综合比选,选取联合导流方案(吐曼河下游导流+渠内导流方案)作为施工导流方案。研究结果为类似工程提供借鉴。
The appropriate diversion scheme for construction is selected by conducting a comparative analysis of several schemes.taking into consideration the actual situation and engineering experience of the railing floodway channel.The combined diversion scheme(lower Tuman River diversion and channel diversion scheme)is selected as the construction diversion scheme based on the comprehensive comparison and selection of the project area,investment,construction safety,construction difficulty and construction period.The findings can serve as a valuable point of reference for similar projects.
作者
田志杰
吴天浩
TIAN Zhijie;WU Tianhao(Zhongshan Water Resources&Hydropower Survey&Design CO.LTD.,Xinjiang branch,Urumqi 830000,China;Henan Water Planning&Design CO.LTD.,Anyang 455000,China)
出处
《河南水利与南水北调》
2024年第5期88-89,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
泄洪渠
导流工程
方案比选
spillway
diversion project
scheme comparison