摘要
为了不影响地面建筑物与地上交通的正常运行,管道的施工多采用非开挖的顶管施工技术。文章以西安曲江新区植物园地下停车场项目为例,针对施工过程中遇到的问题,通过对工程现场施工总结、调查研究和计算分析,提出了一套完整的泥水平衡顶管施工技术方案。希望本方案对类似地下工程项目的泥水平衡顶管施工技术提供有益的参考和借鉴。
In order to avoid disrupting the normal operation of surface buildings and above-ground traffic,non-excavation methods are often employed in pipeline construction,such as pipe jacking construction technology.Taking the underground parking lot project of Xi'an Qujiang New Area botanical garden as a case study,this paper addresses the issues encountered during construction.Through on-site construction summarization,investigation,research and computational analysis,a comprehensive slurry balanced pipe jacking construction technology scheme is proposed.It is hoped that this scheme will provide valuable references and insights for similar underground engineering projects involving slurry balanced pipe jacking construction technology.
作者
冯朝
张健
王亚超
王能辉
FENG Chao;ZHANG Jian;WANG Yachao;WANG Nenghui(China Construction Civil Engineering Co.,Ltd,Beijing 100071 China)
出处
《江苏建筑》
2024年第3期76-80,共5页
Jiangsu Construction
关键词
泥水平衡
顶管
非开挖
施工技术
slurry balance
pipe jacking
non-excavation
construction technology