摘要
利用远程自动化监测系统实时监测哈尔滨地铁3号线太平桥站工程施工期间其毗邻既有地铁车站的结构变化情况。该系统由监测单元、控制通信单元、服务器管理单元和用户交互单元构成,在太平桥站施工期间对既有线结构变形进行了有效的监控,保证了既有地铁线路的安全运营。
The remote automatic monitoring system is used to monitor the structural changes of the adjacent existing subway station during the construction of Taipingqiao Station of Harbin Metro Line 3 in real time.The system is composed of monitoring unit,control communication unit,server management unit and user interaction unit,which effectively monitors the deformation of the existing line structure during the construction of Taipingqiao Station and ensures the safe operation of the existing subway line.
作者
高金铭
李燕
厉风
GAO Jinming;LI Yan;LI Feng(Heilongjiang Construction Group Co.,Ltd.,Heilongjiang 150023,China;Qingdao Baiming Fire Technology Co.,Ltd.,Qingdao 266609,China;JSTI Group Co.,Ltd.,Nanjing 211112,China)
出处
《现代交通技术》
2024年第3期87-91,共5页
Modern Transportation Technology
关键词
地铁施工
既有地铁
自动化监测
subway construction
existing subway
automatic monitoring