摘要
以上海在建某超高层建筑综合体供电项目为例,从供电电源、负荷计算、高压配电、计量、变电所面积等内容,研究供电新政前后项目的两个不同供电设计方案。对两个供电方案进行详细参数对比,结合新政供电要求,分析新政下供电为用户带来容量限制的目的和间接产生的经济效益,可为今后同类建筑的供电设计提供参考。
Taking a super high-rise building complex under construction in Shanghai as an example,this paper studies two different power supply design schemes for the project before and after the new power supply policy,including power supply,load calculation,high-voltage distribution,metering,and substation area.Conduct a detailed parameter comparison between two power supply schemes,combined with the requirements of the new policy for power supply,analyze the purpose of capacity limitation brought to users by power supply under the new policy and the indirect economic benefits,and provide reference for the power supply design of similar buildings in the future.
作者
韩振
HAN Zhen(Shanghai Huajian Engineering Construction Consulting Co.,Ltd.,Shagnhai 200041,China)
出处
《现代建筑电气》
2024年第6期59-64,73,共7页
Modern Architecture Electric
关键词
超高层建筑
容量配置
供电设计
超配费
节能减排
营商环境
super high-rise buildings
capacity configuration
power supply design
overallocation fee
energy conservation and emission reduction
business environment