期刊文献+

一种万向节阀门电动操作工具在水力发电中的可行性研究

Feasibility Study on a Universal Joint Valve Electric Operating Tool in Hydropower Generation
下载PDF
导出
摘要 水电站检修期间,设备运行和检修状态的互转,涉及到阀门全关或全开操作。其中,会出现阀门圈数多、卡涩,多人轮换开关单个阀的问题,造成工作时间长、效率低、人力成本高等现象。通过从万向节和电动扳手获得灵感,研发一种辅助操作工具,针对阀门开关的问题进行研究和分析,制定方案且研究其可行性。 During the maintenance period of hydropower stations,the interaction between equipment operation and maintenance status involves the operation of fully closing or fully opening valves.Among them,there may be problems such as too many valve coils,jamming,and multiple people rotating to switch a single valve,resulting in long working hours,low efficiency,and high labor costs.Taking inspiration from universal joints and electric wrenches,this paper develops an auxiliary operating tool,studies and analyzes the problem of valve switching,develops a plan,and studies its feasibility.
作者 张俊杰 耿晓育 蓝道伟 ZHANG Junjie;GENG Xiaoyu;LAN Daowei(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)
出处 《云南水力发电》 2024年第6期41-44,共4页 Yunnan Water Power
关键词 电动操作工具 阀门操作 提升效率 可行性 electric operating tool valve operation improve efficiency feasibility
  • 相关文献

参考文献4

二级参考文献10

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部