期刊文献+

GB/T 13476-2023《先张法预应力混凝土管桩》主要条款解读

Interpretation of main provisions in GB/T 13476-2023 Pretensioned spun concrete piles
下载PDF
导出
摘要 新修订的国家标准GB/T 13476—2023《先张法预应力混凝土管桩》已于2024年3月1日实施。为便于该标准的各使用方准确理解标准条款的具体含义,正确贯彻实施标准条款的具体要求和规定,介绍了该标准的修订背景和意义,并对标准的主要条款进行了解读。 The newly revised national standard GB/T 13476—2023 Pretensioned spun concrete piles was officially implemented on March 1st,2024.In order to facilitate understanding the specific meaning of standard provisions by the users of this standard,and implementing the specific requirements and provisions of standard clauses correctly,the background and significance of the revision and the main provisions of the standard are interpreted.
作者 田寅 匡红杰 骆静静 王涛 张立力 TIAN Yin;KUANG Hongjie;LUO Jingjing;WANG Tao;ZHANG Lili(Suzhou Concrete and Cement Products Research Institute Co.,Ltd.,Suzhou 215004,China;Guizhou Changtong Group Intelligent Manufacturing Co.,Ltd.,Guiyang 550000,China)
出处 《混凝土与水泥制品》 2024年第6期75-82,共8页 China Concrete and Cement Products
关键词 预应力混凝土管桩 国家标准 要求 试验方法 检验规则 Pretensioned spun conrete pile National standard Requirement Test method Inspection rule
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部