摘要 针对目前在铁路工程技术提升改造项目中涉及到采用闪光焊焊接钢轨,且焊缝数量较少时,直接利用当前铁路工程定额体系下的定额编制的预算与施工过程中实际发生的费用存在一定差异的问题,本文结合某高速铁路信号设备整治工程,对当前定额体系下焊接钢轨的配套定额进行系统分析,得出如下结论:在技术改造项目中焊缝数量较少,闪光焊定额中的人工、台班消耗量与实际存在一定差异,工程费用及型式检验等检验费用考虑不足,设计过程中可以对闪光焊定额的消耗量重新测定,然后对定额中的人工、台班消耗进行适当的调整或采用补充单价分析。 At present,the number of welds in railway engineering technology improvement and renovation projects is relatively small.When using flash welding to weld steel rails,there are differences between the budget prepared directly using the current railway engineering quota system and the actual costs incurred during the construction process.In response to this issue,this article conducts a systematic analysis of the supporting quotas for welded steel rails under the current quota system in conjunction with a high-speed railway signal equipment renovation project.The following conclusion is drawn:in the technical renovation project,the number of welds is relatively small,and there are differences between the labor and machine shift consumption in the flash welding quota and the actual situation,resulting in insufficient consideration of engineering costs and inspection costs such as type inspection.During the design process,the consumption of flash welding quotas can be re measured,and appropriate adjustments can be made to the labor and shift consumption in the quotas or supplementary unit price analysis can be used.
作者 牛安心 NIU Anxin(China Railway Design Group Co.,Ltd.,Tianjin 300308,China)
出处 《铁路工程技术与经济》 2024年第2期26-30,共5页 Railway Engineering Technology and Economy
基金 中国铁设集团公司科技开发计划(2020YY340210)。
关键词 技术改造 轨道工程 焊缝数量 闪光焊 型式检验 定额消耗量 technical transformation track engineering number of welds flash welding type inspection rated consumption
  • 相关文献

参考文献16

二级参考文献62

共引文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部