核化工项目建议书和可行性研究投资估算方法研究

Research on the Methods of Cost Estimation for Nuclear Chemical Projects in the Project Proposal and Feasibility Study
下载PDF
导出
摘要 本文从核化工项目静态投资的划分入手,研究了项目前期工作阶段静态投资的估算方法。建安工程费及其中的土建工程费是核化工项目静态投资的重要组成部分,也是投资估算的难点。本研究重点探讨了建安工程费的估算方法,特别着重阐述了不同工程组成部分的土建工程费用估算方法。本研究为今后核化工项目前期工作阶段的费用估算,特别是建安工程费及其中土建工程费的估算提供了理论参考。 This paper investigates the approach to estimating static investment during the initial operational phase of a nuclear chemical project,starting from the allocation of divisional investments.The construction&installation cost and the civil engineering cost are important parts of static investment of nuclear chemical engineering projects,and also the difficulty of the investment estimation.This study focuses on the estimation methods of construction&installation cost,especially the estimation methods of civil engineering cost for different parts of the project.This study provides a theoretical reference for the cost estimation in the early stages of nuclear chemical engineering projects,in particular the cost of construction&installation and the cost estimation of civil engineering.
作者 郝武民 路梦雪 刘博杰 于洋 唐庆辉 薄美芳 尚鑫 HAO Wu-min;LU Meng-xue;LIU Bo-jie;YU Yang;TANG Qing-hui;BO Mei-fang;SHANG Xin(The 404 Company Limited,China National Nuclear Corporation,Jiayuguan 735100,China;China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
出处 《价值工程》 2024年第8期1-4,共4页 Value Engineering
基金 后处理厂设计技术规范优化研究(KY21150)。
关键词 核化工项目 项目建议书 可行性研究 投资估算 nuclear chemical projects project proposal feasibility study cost estimation
  • 相关文献

参考文献2

二级参考文献18

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部