摘要
以一个地铁标准站的结构设计为例,详细介绍在地铁设计项目中的BIM正向设计应用,分析BIM正向设计在项目的方案及初设阶段、施工图阶段的具体应用点。综合来看,BIM正向设计在该地铁项目中发挥了重要作用,提高了设计效率、减少了工作量,并促进了各专业间的协同工作,为项目的顺利进行提供了有力支持。
This This article introduces the application of BIM positive design in metro design projects by using a metro station design project as example.Some the specific application points of BIM design in the scheme,preliminary and construction drawing stage of the project were analyzed.Overall,BIM design played an important role in this subway project,improving design efficiency,reducing workload,and promoting collaboration among various roles,providing strong support for the smooth progress of the project.
出处
《建筑技术开发》
2024年第2期21-23,共3页
Building Technology Development