期刊文献+

新城金矿破碎岩体巷道涨壳端锚中空注浆锚索支护试验 被引量:2

Test of Expanded Shell End Anchor Hollow Grouting Cable Support in the Fractured Rock Roadway of Xincheng Gold Mine
下载PDF
导出
摘要 针对现有水泥注浆锚索施工工艺复杂、养护前期承载力差,无法在支护初期提供预紧力问题,选用涨壳端锚中空注浆锚索对新城金矿深部破碎围岩巷道进行加固支护。为验证该支护方法的支护能力和效果,分别在新城金矿9-3中段下盘运输巷和9-8中段斜坡道上坡段进行井下工业试验。试验结果表明,涨壳端锚中空注浆锚索锚固力在310 kN左右,并可在安装张拉后立即承载预定预紧力,支护效果优于传统注浆锚索。 In view of the complicated construction process and poor bearing capacity in the early stage of maintenance of the existing cement grouting anchor cable,the expanded shell end anchor hollow grouting cable support is used to reinforce and support the deep broken surrounding rock roadway of Xincheng Gold Mine.In order to verify the supporting ability and effect of this support method,underground industrial tests were carried out in the footplate transport lane in the middle section of 9-3 and the uphill section of the ramp in the middle section of 9-8 in Xincheng Gold Mine.The test results show that the anchorage force of the hol⁃low grouting anchor cable with the expanded shell end anchor is about 310 kN,and the supporting effect is better than that of the traditional grouting anchor cable.
作者 刘滨 LIU Bin(Xincheng Gold Mine of Shangdong Gold Mining Co.,Ltd.)
出处 《现代矿业》 CAS 2024年第1期61-63,68,共4页 Modern Mining
关键词 涨壳端锚中空注浆锚索支护 预紧力 全长锚固 expanded shell end anchor hollow grouting cable support pretightening force full-length anchorage
  • 相关文献

参考文献5

二级参考文献18

共引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部