期刊文献+

基于BIM的高层建筑机电预制装配式机房施工研究 被引量:2

Research on the Construction of Mechanical and Electrical Prefabricated Machine Room in High-rise Buildings Based on BIM
下载PDF
导出
摘要 文中以BIM技术作为施工基础,介绍了高层建筑机电预制装配式机房的设计方案,主要强调支吊架系统、吊装与运输和管道系统的合理性,对于技术的施工应用从预制件的吊装、运输和现场安装等方面进行探究,总结出施工过程的关键环节,以期为类似工程提供参考。 The article uses BIM technology as the construction foundation to introduce the design scheme of the prefabricated mechanical and electrical equipment room in high-rise buildings,mainly emphasizing the rationality of the support and hanger system,lifting and transportation,and pipeline system,Exploring the applicationo f technology in construction from the aspects of lifting,transportation,and onsite installation of prefabricated components,and summarizingt he key links of the construction process,in order to providee ffective reference for similar projects.
作者 林允荣 Lin Yunrong(Fujian Second Construction Group Co.Ltd.,Fuzhou,Fujian 350001)
出处 《江西建材》 2023年第11期353-355,共3页 Jiangxi Building Materials
关键词 高层建筑 机电安装 预制装配式 BIM技术应用 High-rise buildings Mechanical and electrical installation Prefabricated assembly type BIM technology application
  • 相关文献

参考文献6

二级参考文献29

共引文献35

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部