期刊文献+

装配式建筑供应链脆弱性成因及策略研究

Research on Supply Chain Vulnerability Causes and Strategies of Prefabricated Construction
下载PDF
导出
摘要 国内外环境的变换以及各突发事件的冲击对装配式建筑供应链的运营带来了严峻挑战,链中企业呈现出较高的脆弱性。为保障装配式建筑供应链安全与稳定,基于供应链脆弱性定义,从装配式建筑供应链所存在问题展开探讨,以建设方、施工方、供货商与消费者四个角度阐述装配式建筑供应链脆弱性成因,分析各扰动因素对供应链脆弱性的影响路径,提出可通过加强应急管理能力、数字化管理水平以及创新能力等方式改善供应链脆弱性,以期促进装配式建筑高质量发展,为供应链的安全稳定运行提供理论参考。 The change of domestic and foreign environment and the impact of various emergencies have brought severe challenges to the operation of the prefabricated building supply chain,and the enterprises in the chain have shown high vulnerability.In order to ensure the safety and stability of the prefabricated construction supply chain,based on the definition of supply chain vulnerability,this paper discusses the existing problems of the prefabricated construction supply chain,expounds the causes of vulnerability of the prefabricated construction supply chain from the perspectives of builders,constructors,suppliers and consumers,and analyzes the influencing paths of each disturbance factor on the supply chain vulnerability.It is suggested that the vulnerability of supply chain can be improved by strengthening emergency management ability,digital management level and innovation ability,so as to promote the high quality development of prefabricated buildings and provide theoretical reference for the safe and stable operation of supply chain.
作者 王宏妍 谢丹凤 张雅楠 张自然 WANG Hongyan;XIE Danfeng;ZHANG Yanan;ZHANG Ziran(School of Management,Shandong University of Technology,Zibo 255012,China;College of Architectural Engineering,Shandong University of Technology,Zibo 255049,China)
出处 《物流科技》 2024年第3期130-133,共4页 Logistics Sci-Tech
关键词 装配式建筑供应链 供应链脆弱性 脆弱性因素 问题分析 prefabricated building supply chain supply chain vulnerability vulnerability factors problem analysis
  • 相关文献

参考文献8

二级参考文献75

  • 1ZHOU Tao,FU Zhongqian,WANG Binghong.Epidemic dynamics on complex networks[J].Progress in Natural Science:Materials International,2006,16(5):452-457. 被引量:36
  • 2张宏亮,李鹏.PFI项目特点对项目风险事件和脆弱性的影响[J].管理工程学报,2007,21(1):102-109. 被引量:6
  • 3徐家旺,黄小原.价格不确定供应链的多目标运作鲁棒模型[J].工业工程与管理,2007,12(2):7-11. 被引量:6
  • 4刘希龙,季建华.基于多源供应的弹性供应网络研究[J].工业工程与管理,2007,12(3):8-12. 被引量:23
  • 5Ng S T, Wong Y, Wong J. Factors influencing the success of PPP at feasibility stage—— A tripartite comparison study in Hong Kong[J]. Habitat International, 2012, 36(4): 423-432. 被引量:1
  • 6Chan A, Lam P, Chan D, et al. Critical success factors for PPPs in infrastructure developments: Chinese perspective[J]. Journal of Construction Engineering and Management, 2010, 136(5): 484-494. 被引量:1
  • 7Eybpoosh M, Dikmen I, Birgonul M T. Identification of risk paths in international construction projects using structural equation modeling[J]. Journal of Construction Engineering and Management, 2011, 137(12): 1164-1175. 被引量:1
  • 8Dikmen I, Birgonul M T, Fidan G. Assessment of project vulnerability as a part of risk management in construction[C]// Proceedings of Joint 2008 CIB W065/W055 Symposium, 2008: 15-17. 被引量:1
  • 9Ozcan G N. A generic risk and vulnerability assessment framework for international construction projects[D]. Middle East Technical University, 2008. 被引量:1
  • 10Fidan G, Dikmen I, Tanyer A M, et al. Ontology for relating risk and vulnerability to cost overrun in international projects[J]. Journal of Computing in Civil Engineering, 2011, 25(4): 302-315. 被引量:1

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部