摘要
为降低道路施工对城市车辆通行造成的影响,引进BIM技术,以济南市舜泰北路道路工程项目为例,对施工保通方案的设计展开研究。使用BIM技术中的PowerCivil等软件,设计城市道路建筑物的三维建模;增设道路保通临时隔离墩,对施工段与道路车辆通行段进行合理隔离处理;根据城市道路工程施工的实际需求,进行保通方案的动态调整。设计对比实验,实验结果证明:设计的施工保通方案可以在提高车辆通行能力的基础上,降低道路施工与车辆通行的安全冲突行为发生次数,提高施工中车辆行驶的安全性。
In order to reduce the impact of road construction on urban vehicle traffic,BIM technology is introduced to study the design of construction guarantee passing scheme,taking the road project of Shuntai North Road in Jinan as an example.Use PowerCivil and other software in BIM technology to design 3D modeling of urban road buildings;Add temporary isolation piers to ensure road access,and reasonably isolate the construction section and road vehicle section;According to the actual demand of urban road construction,make dynamic adjustment of scheme.The design comparison experiment shows that the designed scheme can reduce the number of safety conflicts between road construction and traffic,and improve the safety of vehicles during construction on the basis of improving the capacity of vehicles during construction.
作者
林木
赵涛
马新颖
LIN Mu;ZHAO Tao;MA Xinying(Jinan Planning and Design Institute,Jinan,Shandong 250101,China;Tianjin Urban Construction Design Institute Co.,Ltd.,Tianjin 300122,China)
出处
《黑龙江交通科技》
2024年第1期29-31,共3页
Communications Science and Technology Heilongjiang
关键词
BIM技术
动态调整
临时隔离墩
保通方案
施工模型
BIM technology
dynamic adjustment
temporary isolation pier
guarantee passing scheme
construction model