琅琊山电站主坝渗透压力监测分析

Monitoring and analysis of seepage pressure in main dam of Langyashan Power Station
下载PDF
导出
摘要 本文基于琅琊山电站主坝渗流监测资料,结合坝肩地质条件和工程防渗处理措施,通过时间过程和空间分析的方法研究分析了大坝渗流特性。结果表明,坝基渗透压力变化稳定,两岸绕坝渗流现象不明显,大坝漏水量与国内同类工程相比较小,坝基防渗效果良好。 Based on the seepage monitoring data of the main dam of Langyashan Power Station,combined with the geological conditions of the dam abutment and the project anti-seepage treatment measures,the seepage characteristics of the dam are studied by means of time process and space analysis.The results show that the seepage pressure of the dam foundation is stable,the seepage around dam on both sides is not obvious,the leakage of the dam is smaller than that of similar projects in China,and the seepage prevention effect of the dam foundation is good.
作者 戴江鸿 DAI Jiang-hong
出处 《东北水利水电》 2024年第1期22-25,71,共5页 Water Resources & Hydropower of Northeast China
关键词 浸润线 绕坝渗流 渗透量 监测 琅琊山电站 saturation line seepage arounddam seepage discharge monitoring Langyashan PowerStation
  • 相关文献

参考文献4

  • 1王德厚编著..大坝安全监测与监控[M].北京:中国水利水电出版社,2004:268.
  • 2唐正州,段斌,何江达,符文熹,杨兴国.大岗山水电站厂坝区三维天然渗流场反演分析[J].四川水利,2007,28(1):44-47. 被引量:6
  • 3赵亚永..白鹤滩水电站右岸厂坝区渗流分析与渗控效果评价研究[D].武汉大学,2017:
  • 4关志诚主编..水工设计手册 第6卷 土石坝[M].北京:中国水利水电出版社,2014:842.

二级参考文献2

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部