摘要
电力工程中的变电站是电能传输和配送的关键环节,其施工过程受到多种因素的影响。了解和分析这些影响因素,并通过优化施工组织,对于变电站的高效建设和电网的可靠运行至关重要。从电力工程中变电站施工的特点入手,对电力工程中变电站施工影响因素进行分析,并提出电力工程中变电站施工的组织优化策略,旨在为变电站的施工组织优化工作提供指导和启示,促进电力工程的发展。
The substation in power engineering is a key link of power transmission and distribution,and its construction process is affected by many factors.Understanding and analyzing these influence factors and optimizing construction organization are essential to ensure the efficient construction of substations and the reliable operation of power grids.Starting from the characteristics of substation construction in power engineering,this paper analyzes the influence factors of substation construction in power engineering,and puts forward the optimization strategy of the construction organization of substations in power engineering,aiming to provide guidance and inspiration for the optimization of the construction organization of substations and promote the development of power engineering.
作者
万生学
WAN Shengxue(Jingjian Branch,Hubei Jingneng Power Transmission and Transformation Engineering Co.,Ltd.,Jingmen,Hubei Province,448000 China)
出处
《科技资讯》
2023年第23期62-65,共4页
Science & Technology Information
关键词
电力工程
变电站施工
电能传输
施工
组织优化
Power engineering
Substation construction
Power transfer
Construction
Organization optimization