期刊文献+

多利益主体下具有多个禁止时间窗口的项目群业主计划费用现值优化模型——以新沂河整治项目群为例

Optimal Model for the Present Value of Employer's Planned Cost of Programs with Multiple Prohibited Time Windows under Multiple Interest Subjects:A Case Study of Xinyi River Repairing Program
下载PDF
导出
摘要 首先,界定问题,详细分析项目群业主计划费用现值优化原理,并将合同项目进行了分类。其次,考虑具有多个特殊合同项目的特殊性,构建项目群业主计划费用现值优化模型。第三,当优化工期小于项目群合理工期时,研究并构建项目群不同工期下业主计划费用现值优化模型。第四,结合新沂河整治项目群(Y)开展案例分析,验证模型的可行性和有效性。最后,提出管理启示。研究结果表明,当项目群工期压缩幅度保持在一定范围内时,业主计划费用现值(或收益)与工期之间是一种累积关系,即两者可以得到同时优化;但是项目群工期压缩幅度超过某一个范围时,业主计划费用现值(或收益)与项目群工期之间是一种权衡关系,两者不能同时得到优化,即一个目标的优化要以牺牲另一个目标为代价,业主需要在两者之间作出取舍。研究结论为业主科学、合理开展业主计划费用现值的优化提供参考。 First of all,the problem is defined,the principle of optimizing the present value of the employer's planned cost of the program is analyzed in detail,and the contracted project is divided into two categories:the first category is the contracted project that can be completed in the original time window;The second category is the contracted project that can be completed in the second,third,.and other subsequent time windows.Secondly,considering the particularity of the contracted project with multiple forbidden times,an optimization model of the present value of the employer's planned costs of the program before and during the implementation of the program is constructed.Thirdly,when the optimized construction period is less than the reasonable construction period of the program,the present value optimization model of the employer's planned cost under different construction periods of the program is studied and constructed.Fourthly,a case study was carried out in combination with program Y to verify the feasibility and effectiveness of the model.Finally,the management inspiration is put forward.The results show that when the duration of the program is compressed within a certain range,there is a cumulative relationship between the present value(or income)of the employer's planned cost and the duration,that is,both can be optimized at the same time;The reduction of the construction period of the program exceeds a certain range.There is a trade-off between the present value(or income)of the employer's planned cost and the construction period of the program.The two cannot be optimized at the same time.The employer needs to choose between the present value(or income)of the cost and the construction period.The research results of this paper provide a reference for employers to scientifically and reasonably optimize the present value(or income)of employers'planned costs.
作者 丰慧 张焱 张辰颖 聂蕊琪 Fen Hui;hang Yan;Zhang Chenying;Nie Ruiqi(School of Economics and Management,Nanjing Institute of Technology,Nanjing 211167,China;Business School,Bohai University,Nanjing 211100,China)
出处 《科技管理研究》 北大核心 2023年第19期205-220,共16页 Science and Technology Management Research
基金 江苏省社会科学基金项目“‘双碳’目标下数字赋能江苏水生态协同治理路径与机制研究”(23GLD006) 住房和城乡建设部科学技术项目“城乡建设工程智慧管理平台研发及应用”(2018-K8-23) “十一五”国家科技支撑计划重大项目“工程建设与运营管理关键技术研究”(2006BAB04A13) 中央高校基本科研业务费项目“战略视角下长江大保护水环境基础设施治理模式与对策建议”(B220207039) 河海大学南京市建设行业科技计划项目“智慧工地在线巡检及数据分析关键技术研究”(K2213)。
关键词 项目群 甲供非商品化资源 禁止时间窗口 模型 业主计划费用现值 program non-commercial resources provided by employer(NCRPE) forbidden time windows model present value of employer's planned cost
  • 相关文献

参考文献13

二级参考文献127

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部