摘要
文中以厦门市某地下式再生水厂工艺选择为例,根据进出水水质和当地实际状况,对再生水厂的二级处理和深度处理等工艺进行比选,最终确定采用预处理+A2/O+二沉池+深度处理+超滤膜工艺为最佳建设方案。
This article takes the process selection of an underground reclaimed water plant in Xiamen as an example.Based on the inlet and outlet water quality and local actual conditions,the secondary treatment and deep treatment processes of the reclaimed water plant are compared and selected.Finally,the optimal construction plan for the reclaimed water treatment process is determined to be pre-treatment+A/O+secondary sedimentation tank+deep treatment+ultrafiltration membrane process.